Furis Group Co.,Ltd
furis@furisgroup.com+86-577-65527144
Home > Knowledge > Content

Coating machine installed to use

Furis Group Co.,Ltd | Updated: Jan 10, 2018
Source:

1, turn on the power. Note: phase, zero line can not take the wrong.


2, the gas source through the Φ8PU tube and the body of the trachea connected to the underside.


3, to the liquid tube to add coating solution.


4, start the power switch, then turn on the power.


5, according to the host governor instructions to adjust the host speed.


6, turn on the air conditioning switch, into the fan to work.


7, adjust the temperature controller, the temperature transferred to the temperature value you need, this time as the actual temperature is lower than the set value, the heater power is turned on, the heater starts to heat. If the actual temperature is higher than the set value, the heater power is off and the heater stops heating.


8, open the gun switch, the gun began to work, the use of the gun, please refer to the gun manual.


9, after adjusting the above functions properly, you can turn on the air compressor, the air pressure is about 4 ~ 6kg / cm3.


Feedback
Your comments are welcome!
For more information about our brand and products, please feel free to contact us!
Please enter your email address:
Contact Us
Address: Feiyun Industrial Zone, Feiyun Town, Ruian City, Zhejiang Province, China
Tel: +86-577-65527144
Fax: +86-577-65527144
E-mail: furis@furisgroup.com
WhatsApp: 008613515779235
skype: furisgroup
Copyright © Furis Group Co.,Ltd All Rights Reserved.